Photo of prefabricated M&E skids being craned into a data center building on a construction site
B + IS SKID SOLUTION

Building + Integrated Skid
New Paradigm for Decoupled Construction

For large-scale AI compute campuses, we decouple traditionally complex M&E engineering into modular prefabricated skids, running civil works and factory prefabrication in parallel so on-site work is limited to stacking, hoisting, and integration testing.

SKID FAMILY

Four Skid Types, One Parallel Track

M&E systems are assembled and pre-commissioned in the factory, compressing on-site work down to interface connection and integrated testing.

Transformer & Power Distribution Skid

Includes medium/low-voltage distribution and transformers, assembled and commissioned in-factory, ready to connect to the power chain on arrival.

IT Corridor Skid

Supports high-density GPU server racks (cold plate / immersion liquid cooling) with high space utilization and high heat-rejection capacity.

Air Wall / Chilled Water Skid

High-efficiency cooling units are fully prefabricated, greatly reducing on-site pipe welding and commissioning work.

Civil Works & Skids in Parallel

The general contractor completes the building's civil works while the factory simultaneously prefabricates skids, enabling parallel delivery.

SKID DIAGRAM

How Skids Enter the Building

Factory-prefabricated skids are transported to the site and hoisted into place, floor by floor, at their designated interfaces, connecting to the building's core structure.

B+IS decoupled construction diagram: factory-prefabricated power, IT, and cooling skids connecting to the data center building
Schematic: power distribution, IT, and cooling skids complete integrated testing at the factory, then connect to reserved interfaces on the building's core structure once on-site.
Photo of skid assembly in the factory
Photo: skids complete enclosure, piping, and M&E assembly in the factory environment, with item-by-item pre-commissioning.
SCHEDULE COMPARISON

Traditional Construction vs. Prefab Modular Delivery Timeline

Factory prefabrication runs in sync with on-site civil works, so on-site assembly takes just 2-3 months to complete stacking, hoisting, and rapid go-live.

Overseas Traditional Approach

20 months
  • Blueprint & construction design: 8 months
  • On-site construction: 10 months
  • Commissioning: 2 months

XAgent AI Prefabrication

11 months
  • Blueprint refinement: 5 months
  • Factory prefabrication & transport: 4 months
  • On-site assembly & commissioning: 2 months

Timeline figures are typical project comparisons; actual delivery timelines depend on site conditions, configuration, permitting, and supply chain arrangements.