Transformer & Power Distribution Skid
Includes medium/low-voltage distribution and transformers, assembled and commissioned in-factory, ready to connect to the power chain on arrival.

M&E systems are assembled and pre-commissioned in the factory, compressing on-site work down to interface connection and integrated testing.
Includes medium/low-voltage distribution and transformers, assembled and commissioned in-factory, ready to connect to the power chain on arrival.
Supports high-density GPU server racks (cold plate / immersion liquid cooling) with high space utilization and high heat-rejection capacity.
High-efficiency cooling units are fully prefabricated, greatly reducing on-site pipe welding and commissioning work.
The general contractor completes the building's civil works while the factory simultaneously prefabricates skids, enabling parallel delivery.
Factory-prefabricated skids are transported to the site and hoisted into place, floor by floor, at their designated interfaces, connecting to the building's core structure.


Factory prefabrication runs in sync with on-site civil works, so on-site assembly takes just 2-3 months to complete stacking, hoisting, and rapid go-live.
Timeline figures are typical project comparisons; actual delivery timelines depend on site conditions, configuration, permitting, and supply chain arrangements.